Author Archives: Co:LAB Student
The Public Exhibition Ramp – Vivek Jnagal
The central architectural feature of The Public, called ‘the ramp’ is being reviewed in the next 6 months. The original building design was that people would start the gallery (third floor) journey along the ramp with a number of
The Public Exhibition Ramp – Vivek Jnagal
The central architectural feature of The Public, called ‘the ramp’ is being reviewed in the next 6 months. The original building design was that people would start the gallery (third floor) journey along the ramp with a number of
Selecting Work for inclusion in Publication
During the earlier stages of the project art and design students and architecture students were asked to collaborate to produce work that related to the Tecton structures at Dudley Zoo Gardens. The art and design students were also involved in
Selecting Work for inclusion in Publication
During the earlier stages of the project art and design students and architecture students were asked to collaborate to produce work that related to the Tecton structures at Dudley Zoo Gardens. The art and design students were also involved in
DZG Design Team Meeting
Today we met the new members of the team, that had come on board for the DZG project. We also met a new Art + Design student ‘Dan’, who has volunteered to help with the project. We also me ‘Larry
DZG Design Team Meeting
Today we met the new members of the team, that had come on board for the DZG project. We also met a new Art + Design student ‘Dan’, who has volunteered to help with the project. We also me ‘Larry
Aluminium Tectonics: Prototype Construction And Testing
Testing the first piece of Aluminium on the CNC Machine with the New cutting tool. Our first concept idea coming to life although there were a few hiccups which would need improving for the next test which are listed below, 1. Bending the thick
Aluminium Tectonics: Prototype Construction And Testing
Testing the first piece of Aluminium on the CNC Machine with the New cutting tool. Our first concept idea coming to life although there were a few hiccups which would need improving for the next test which are listed below, 1. Bending the thick
Final Concept – Group 5
We decided on 5 ‘boxes’, each one relating to one of the senses. These would be spread over the two kiosks and would mimic aspects of the original Tectons.
Final Concept – Group 5
We decided on 5 ‘boxes’, each one relating to one of the senses. These would be spread over the two kiosks and would mimic aspects of the original Tectons.
Highbury Park – Patrick Henry Combination Entries
Highbury Park – Patrick Henry Entry 1 We have been introduced to the highbury park project with a site visit, exploring the area around the pond, hearing about the history and seeing how people occupy the space in differing ways.
Highbury Park – Patrick Henry Combination Entries
Highbury Park – Patrick Henry Entry 1 We have been introduced to the highbury park project with a site visit, exploring the area around the pond, hearing about the history and seeing how people occupy the space in differing ways.
HIGHBURY PARK: ULA BUJAUSKAITE
———————————————Meeting 3 Precedents It is interesting how the group of people who been given the task to research viewing platforms would all pick completely different designs, not only varying in scale but ideas behind it as well. After looking at
HIGHBURY PARK: ULA BUJAUSKAITE
———————————————Meeting 3 Precedents It is interesting how the group of people who been given the task to research viewing platforms would all pick completely different designs, not only varying in scale but ideas behind it as well. After looking at
Model – Group 8
As a group we came together to construct our final model for our tecton walkway. We use a timber frame, with a plastic insert to prevent the wood from absorbing the moisture for the plaster, and sticking to the frame.
Model – Group 8
As a group we came together to construct our final model for our tecton walkway. We use a timber frame, with a plastic insert to prevent the wood from absorbing the moisture for the plaster, and sticking to the frame.
Precedent
SOCA ‘The London Dresser’ is one of our precedents which demonstrate a live scaled model of the London South-bank showing the buildings on a scale which people can touch them and interact with them. This allows people to analyse and
Precedent
SOCA ‘The London Dresser’ is one of our precedents which demonstrate a live scaled model of the London South-bank showing the buildings on a scale which people can touch them and interact with them. This allows people to analyse and
Final scheme drawings – Group 8
Following from the physical model making, i have created a 3D computer model of out structure, showing how the tecton walkway will be used as an exhibition space, as well as a mapping and educational monument which leads to people
Final scheme drawings – Group 8
Following from the physical model making, i have created a 3D computer model of out structure, showing how the tecton walkway will be used as an exhibition space, as well as a mapping and educational monument which leads to people
New member joins the group – Group 8
After being informed that we were getting a new member into our group, there was some concern on how it would affect the dynamics that we had constructed over the previous month or so. The was a discussion on whether
New member joins the group – Group 8
After being informed that we were getting a new member into our group, there was some concern on how it would affect the dynamics that we had constructed over the previous month or so. The was a discussion on whether
Casting workshop – Group 8
The castingwork shop was extremely useful, as it informed our design and made us realise a number of issue with our concept. We originally decided to construct an instillation our of pre-fabricated concrete, using the original 12 Tectons as inspiration.
Casting workshop – Group 8
The castingwork shop was extremely useful, as it informed our design and made us realise a number of issue with our concept. We originally decided to construct an instillation our of pre-fabricated concrete, using the original 12 Tectons as inspiration.
Original Scheme – Group 8
The original scheme was to create a new Tecton instillation which would derive inspiration from the existing Tectons, by abstracting forms for the original structures. The main reason for this would be to educate people on the structures and try
Original Scheme – Group 8
The original scheme was to create a new Tecton instillation which would derive inspiration from the existing Tectons, by abstracting forms for the original structures. The main reason for this would be to educate people on the structures and try
Initial Ideas
Following the visit to Dudley Zoological Gardens each member of Group eight drafted a variety of designs to be explorer and discussed during our review. This allowed us to learn about individual strength the group would have, and what direction
Initial Ideas
Following the visit to Dudley Zoological Gardens each member of Group eight drafted a variety of designs to be explorer and discussed during our review. This allowed us to learn about individual strength the group would have, and what direction
You must be logged in to post a comment.