Model – Group 8

As a group we came together to construct our final model for our tecton walkway. We use a timber frame, with a plastic insert to prevent the wood from absorbing the moisture for the plaster, and sticking to the frame.

Model – Group 8

As a group we came together to construct our final model for our tecton walkway. We use a timber frame, with a plastic insert to prevent the wood from absorbing the moisture for the plaster, and sticking to the frame.

Precedent

SOCA ‘The London Dresser’ is one of our precedents which demonstrate a live scaled model of the London South-bank showing the buildings on a scale which people can touch them and interact with them. This allows people to analyse and

Precedent

SOCA ‘The London Dresser’ is one of our precedents which demonstrate a live scaled model of the London South-bank showing the buildings on a scale which people can touch them and interact with them. This allows people to analyse and

Final scheme drawings – Group 8

Following from the physical model making, i have created a 3D computer model of out structure, showing how the tecton walkway will be used as an exhibition space, as well as a mapping and educational monument which leads to people

Final scheme drawings – Group 8

Following from the physical model making, i have created a 3D computer model of out structure, showing how the tecton walkway will be used as an exhibition space, as well as a mapping and educational monument which leads to people

New member joins the group – Group 8

After being informed that we were getting a new member into our group, there was some concern on how it would affect the dynamics that we had constructed over the previous month or so. The was a discussion on whether

New member joins the group – Group 8

After being informed that we were getting a new member into our group, there was some concern on how it would affect the dynamics that we had constructed over the previous month or so. The was a discussion on whether

Casting workshop – Group 8

The castingwork shop was extremely useful, as it informed our design and made us realise a number of issue with our concept. We originally decided to construct an instillation our of pre-fabricated concrete, using the original 12 Tectons as inspiration.

Casting workshop – Group 8

The castingwork shop was extremely useful, as it informed our design and made us realise a number of issue with our concept. We originally decided to construct an instillation our of pre-fabricated concrete, using the original 12 Tectons as inspiration.

Original Scheme – Group 8

The original scheme was to create a new Tecton instillation which would derive inspiration from the existing Tectons, by abstracting forms for the original structures. The main reason for this would be to educate people on the structures and try

Original Scheme – Group 8

The original scheme was to create a new Tecton instillation which would derive inspiration from the existing Tectons, by abstracting forms for the original structures. The main reason for this would be to educate people on the structures and try

Initial Ideas

Following the visit to Dudley Zoological Gardens each member of Group eight drafted a variety of designs to be explorer and discussed during our review. This allowed us to learn about individual strength the group would have, and what direction

Initial Ideas

Following the visit to Dudley Zoological Gardens each member of Group eight drafted a variety of designs to be explorer and discussed during our review. This allowed us to learn about individual strength the group would have, and what direction

Highbury Park – Craig Rigby – 5

Finally after months of work the project has taken shape and the Final Design has been created. Our final group design is all about three things interaction, habitation and succession. The Interaction side of the design is with the stepping

Highbury Park – Craig Rigby – 5

Finally after months of work the project has taken shape and the Final Design has been created. Our final group design is all about three things interaction, habitation and succession. The Interaction side of the design is with the stepping

Sam Baker – Highbury Park week 7

The final week, I finished off the model with Patrick and everyone else finished off the presentation the final design and everyone finished off their report. I learnt a lot from these final stages such as model making, researching and

Sam Baker – Highbury Park week 7

The final week, I finished off the model with Patrick and everyone else finished off the presentation the final design and everyone finished off their report. I learnt a lot from these final stages such as model making, researching and

Scheme B working models – Group 4

As previously discussed the scheme was modeled in an effort to create further clarity within the design. The clarity would enable the group to for see any issues and address them, and would also allow the client to better understand

Scheme B working models – Group 4

As previously discussed the scheme was modeled in an effort to create further clarity within the design. The clarity would enable the group to for see any issues and address them, and would also allow the client to better understand

Scheme B technical drawings – Group 4

Once the scheme has been finalised in sketch form within sketchbooks, the group work was divided. The architecture student was given the task of drawing plans and an elevation of the proposed scheme, while the art and design students would

Scheme B technical drawings – Group 4

Once the scheme has been finalised in sketch form within sketchbooks, the group work was divided. The architecture student was given the task of drawing plans and an elevation of the proposed scheme, while the art and design students would

Scheme B – Group 4

Scheme B was developed after receiving feedback from Stuart Whipps and Mike Dring. The changes that were required related to the height of the fins, the materiality and the creating of a pathway between the fins. The height of the

Scheme B – Group 4

Scheme B was developed after receiving feedback from Stuart Whipps and Mike Dring. The changes that were required related to the height of the fins, the materiality and the creating of a pathway between the fins. The height of the

Scheme A material texture – Group 4

To further the developed Scheme A before meeting with Mike Dring and Stuart Whipps to discuss the groups progress a casting workshop was held, it was while at the casting workshop the idea of adding a texture to the finish

Scheme A material texture – Group 4

To further the developed Scheme A before meeting with Mike Dring and Stuart Whipps to discuss the groups progress a casting workshop was held, it was while at the casting workshop the idea of adding a texture to the finish

Scheme A – Group 4

Scheme A was the development of collective contributions made by all members of the group. The idea for the temporary exhibition space was to create three large “fins” on the group behind the entrance. The three fins were a copy

Scheme A – Group 4

Scheme A was the development of collective contributions made by all members of the group. The idea for the temporary exhibition space was to create three large “fins” on the group behind the entrance. The three fins were a copy