Week 7 of Colab – Preparations
4 groups were created after the interim review: Ramp / Walls / Fabric / Multi-sensory. Each group has an assigned task to finish for the performance.
This week we started the preparations for our performance in the Shell. We made the wall structures, fabric has been bought, the ramp is almost finished and graphics are ready for the show. Everything is going great!
Make sure to swing by the Shell next Wednesday morning (18/03/2020)!
By Pavels Jeremenko (BA Architecture)