In the sketches above, relay how the walls of the tunnel are connected. These are just simple sketches and an AutoCad Technical will be produced.
Each panel will be 1m long and will be slotted into an existing frame, with a tongue and groove system.
Antigone: Group 1 – Kiren Chanderh & Khadijah Mubarak.
You must be logged in to post a comment.